Get complete information related to latest Coupling Hook Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Coupling Hook Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Coupling Hook Tenders.
Tender For call for purchasing of all kind of road and building material at hirdamali - building materails, cements isi marks 53 gread (ambuja), cements isi marks 53 gread (utratech), cements isi marks 53 gread (birla gold), cements isi marks 53 gread (acc), stell isi mark (6 mm), stell isi mark (8 mm), stell isi mark (10 mm), stell isi mark (12 mm), stell isi mark (16 mm), stell isi mark (20 mm), pevar block 60mm thikness coloring strenghtg of 300 kg/sq.cm approved quality, 10 mm metal crusher broken (pachgaon), 10 mm metal crusher broken (local), 20 mm metal crusher broken (pachgaon), 20 mm metal crusher broken (local), 40 mm metal hand broken (pachgaon), 40 mm metal hand broken (local), 80 mm metal hand broken, soil bricks is type std size, cement bricks is type std size, chaker tiles, vetrified tiles, tiles, sand transport with roylti, sand transport without roylti, murum transport with roylti, murum transport without roylti, rcc np-2 second 1000mm pipe with collars, rcc np-2 second class 800mm pipe with collars, rcc np-2 second 600mm pipe with collars, rcc np-2 second 450mm pipe with collars, rcc np-2 second 300mm pipe with collars, centring, mixture machine rent with diesel, hand mixture machine rent, hopper mixture machine rent with diesel, rolar machine rent with diesel, tractor water tankar, bleaching powder, slate writing pad, banner, dust bean steel, printing, santary pad, garbage e rickshaw, garbage cycle rickshaw, solar high mast light, solar streat light pol, pevar block 60mm thikness coloring strenghtg of 300 kg/sq.cm approved quality, iron chair 3 seater, m.s.pipe/ angle / squee, g.i. steel, chaker tiles, vetrified tiles, tiles, paver block 6mm, paver block 8mm, gi pipe 1 " 5.5 kg., chain, bearing 6204, cylinder ci brass/ cyl body/ cyl paile, leather washer / ceiling washer, rod golden connecting, socket 32 mm, axle pin, nut bolt 19 no, upper valve/ lower valve, handle complete, head/ water tank, column pipe m.s. (stand), hand pump complete set, pvc pipe ",1 " 10 ft., pvc pipe 3"/6" 10 ft., pvc socket ", 2", 6", pvc coupler 75mm, 160 mm elbow, pvc tee 1",2",3", 6" tunion, elbow, socket,fta,mta, pvc valve ",1",3", tank nipple, pvc tank nipple 1",3",6", pvc bush brass 1/2" ,2" redser, elbow, union, union pvc 1",2",3", elbow brass pvc 1",2" tea, mta pvc 1/2",2", flute valve 1/2",1",2", kaju clip 1", 2", fta 1/2", 1", 2", cap 1",2",3", pvc bend 1",2",3", pvc solvent/ upvc, teplon tape/ electric tape, 10mm nylon rope, 2.5 mm cable/4 mm cable, mcb 3 pol, starter (pump motor)/auto swithch, kitkat 63 amp/32 amp, main switch 440v, pump set 1 hp/2hp, pump set 3 hp, pump set 5 hp/7.5hp, pump set 10 hp, steel nipple / round cap 150 mm, clamp nut bolt / g.i.patti, band 1", 2" gi/ bush 1 ", 2 ", water tank 6 layerplasto, hammer/adjust pana/16mm vice, patti pana set/ring pana set/ adjust pana, sulaj main wall 65 mm/80 mm/160 mm, plas 65 mm, 80 mm, 160 mm, cock nul 1/2", 1", gun metal ferul "/ mdpe fta, water miter, mdpe pipe inch/ hdpe, mdpe fta ", service sydle 110 x 1/2 ", mcb box topson 3-4w, socket switch, socket switch 16a, switch 1w 6a/16a, kaju clip 25mm / 19mm, pipe 19mm/25 mm, man switch 32-240, j.box 19mm 3w, mcb 63a/32a, metal box 3 way, kitkat 32-240/63a-415a, holder, isolator 63a/32a, alu wire 4mm single /twin 90 m, wire 1mm 1.5 mm /90 m, wire 2.5mm/4mm 90m, tape anchor 6mtr/tester, crompton fan 48"/ wall fan, cooler kit, ext box 4 scolet, street light 18w/45w, led bulb 5w/9w, led bulb 22w/40w, bulb 15w/20w, 3core cable 1.5mm /2.5mm/ 4mm /6mm, sanmika board 10*12, street fitting box 1 led, street fitting pipe 1"/2", g.i.tar/g.i tin box, cooler 2.5 ft /4 ft., inverter 1500 seb, battery 1800 ah/2200 ah, screw driver/nose plyer, cutter/penches, patti pane set/ring pana set, wall watch / ele. bel, cooler stand, led driver kit 30w/45w/100w, solar home light with fan and installation, water cooler 80 ltr/20 ltr, r.o. 50 ltr/100 ltr/15 ltr, mini water supply scheme g.i. structure complete 3000 ltr/5000ltr, soalr pump complete 1 hp
Tender For supply of design and fabrication of cope cage : - 40 mm x 40 m y type pipe structure of 7 feet with 1 feet 40 mm x 5 mm angle with installation , 8 feet 40 mm x 5 mm angle for horizontal support with installation , center stand spring 3 mm with installation , hinges of 50 mm thickness with 12 mm hole with bolt 6 inch , horizontal round plain bar fixed in mesh with installation , steel wire of 10 mm x 10 feet with installation , stallion winch with smooth pulling feature with installation , steel u clamp , 1 feet x 1 feet u structure of 40 mm x 5 mm angle frame for hing with installation , 50 mm x 50 mm galvanised interlocked mesh of 9 feet x 7 feet with installation , nut bolts 12 mm x 50 mm , abrasive cutting wheel 4 inch , 10 no welding rod , paint
Tender For 10/edc(s)/2025-26 - part-a (material), following materials supplied by the contractor :-, stone pad., lt clamp with nut & bolts., earth wire clamp with nut & bolts., clamp for top/t-off/dropper., suspension clamp., dead end clamp., eye hook., eye hook clamp., x-arm holding clamp., red oxide paint., alluminium paint., f-bracket., guarding angle., guarding angle clamp., shackle insulator., distribution box 3 phase with clamp., stay loop insulator, bolts, nuts & washers all sizes., l.t. connector (pearcing)., safe carriage/cartage of following items from store centre, sultanpur to work site including loading, unloading and proper stacking (distance within 0-50 km.), safe carriage of stp 11 mtr., safe carriage of pcc pole 8.5 mtr. long., safe carriage of acsr weasel conductor/dog conductor., safe carriage of 11 kv xlpe cable al. 3x120/3x70 sq.mm., safe carriage of lt xlpe cable abc 1 phase/3 phase., safe carriage of meter qubical., safe carriage of ct/pt combinud unit., safe carriage of t/f 25 kva., safe carriage of t/f 63 kva., safe carriage of t/f 100 kva., safe carriage of t/f 250 kva., safe carriage of t/f 400 kva., safe carriage of other line materials., dragging of stp from site to pit point., dragging of pcc pole from site to pit point., fabrication & errection of single pole 11 mtr support on stp including digging of pit & fixing of all accessories and clamps as per respo norms., fabrication & errection of double pole 11 mtr support on stp including digging of pit & fixing of all accessories and clamps as per respo norms., fabrication & errection of single pole support on pcc pole including digging of pit & fixing of all accessories and clamps as per respo norms., fabrication & errection of double pole support on pcc pole including digging of pit & fixing of all accessories and clamps as per respo norms., grouting of structure by digging od pit 1.83 mtr. deep for 11 mtr stp/8.5 mtr pcc pole foundation is provided with help of steel or wooden formers, groutung with 1:4:5 ratio cement, sand & first class brick ballast 0.285 cu mtr for 11 mtr stp/8.5 mtr pcc pole plinthing 0.3 mtr above g/l and proper plastering as per respo norms., earthing of 11 mtr stp/8.5 mtr pcc pole as per respo norms., stay complete., laying stringing & sagging of new acsr weasel conductor/dog conductor including binding jumpering etc., digging of trench & laying of cable 11 kv xlpe cable 3x120/3x70 sq.mm including sands & brick., hanging hosting & clamping and g.i. pipe channel nut & bolts 3x120/3x70 sq mm xlpe 11 kv cable (cost of all accessories will be borne by contractor) as per resspo norms., installation and fixing of heat shrinkable type 11 kv cable joiting kit 3x120/3x70 sq mm xlpe cable box as per norms., high pressure testing after completion of laying of 11 kv xlpe cable, fixing of joints & termination. (testing equipment shall be arranged by the contractor)., making cable jointing kit i/d & o/d 3x120/3x70 sq.mm., installation of meter qubical., installation of ct/pt combinud unit., route cable marker with size 3x1.5 feet stone for underground cable at every 100 mtr from initial point with notice "11 kv u/g line" painted on it (all the material, manpower and t&p will be arranged by the contractor at his own cost)., road restoration charges for pucca road crossing., road restoration charges for footpath side., laying stringing & sagging of lt xlpe cable abc 3x120+1x95+1x16/3x50+1x35+1x16/1x25+ 1x16 sq.mm., erection and mounting of 25 kva t/f., erection and mounting of 63 kva t/f., erection and mounting of 100 kva t/f., providing and installation of smc box for 25 kva to 100 kva., installation of 250/400 kva t/f on plinth., construction of plinth for 250/400 kva t/f including of all material as per respo norms., fencing work suitable of 250/400 kva t/f plinth of size 15x12x8 and angles of suitable size should be grouted on all 04 corners and 01 side for gate.
Tender For runningcontractfordepositworksunderedd-lambhua,sultanpur. - part-a (material), following materials supplied by the contractor :-, stone pad., lt clamp with nut & bolts., earth wire clamp with nut & bolts., clamp for top/t-off/dropper., suspension clamp., dead end clamp., eye hook., eye hook clamp., x-arm holding clamp., red oxide paint., alluminium paint., f-bracket., guarding angle., guarding angle clamp., shackle insulator., distribution box 3 phase with clamp., stay loop insulator, bolts, nuts & washers all sizes., l.t. connector (pearcing)., safe carriage/cartage of following items from store centre, sultanpur to work site including loading, unloading and proper stacking (distance within 0-50 km.), safe carriage of stp 11 mtr., safe carriage of pcc pole 8.5 mtr. long., safe carriage of acsr weasel conductor/dog conductor., safe carriage of 11 kv xlpe cable al. 3x120/3x70 sq.mm., safe carriage of lt xlpe cable abc 1 phase/3 phase., safe carriage of meter qubical., safe carriage of ct/pt combinud unit., safe carriage of t/f 25 kva., safe carriage of t/f 63 kva., safe carriage of t/f 100 kva., safe carriage of t/f 250 kva., safe carriage of t/f 400 kva., safe carriage of other line materials., dragging of stp from site to pit point., dragging of pcc pole from site to pit point., fabrication & errection of single pole 11 mtr support on stp including digging of pit & fixing of all accessories and clamps as per respo norms., fabrication & errection of double pole 11 mtr support on stp including digging of pit & fixing of all accessories and clamps as per respo norms., fabrication & errection of single pole support on pcc pole including digging of pit & fixing of all accessories and clamps as per respo norms., fabrication & errection of double pole support on pcc pole including digging of pit & fixing of all accessories and clamps as per respo norms., grouting of structure by digging od pit 1.83 mtr. deep for 11 mtr stp/8.5 mtr pcc pole foundation is provided with help of steel or wooden formers, groutung with 1:4:5 ratio cement, sand & first class brick ballast 0.285 cu mtr for 11 mtr stp/8.5 mtr pcc pole plinthing 0.3 mtr above g/l and proper plastering as per respo norms., earthing of 11 mtr stp/8.5 mtr pcc pole as per respo norms., stay complete., laying stringing & sagging of new acsr weasel conductor/dog conductor including binding jumpering etc., digging of trench & laying of cable 11 kv xlpe cable 3x120/3x70 sq.mm including sands & brick., hanging hosting & clamping and g.i. pipe channel nut & bolts 3x120/3x70 sq mm xlpe 11 kv cable (cost of all accessories will be borne by contractor) as per resspo norms., installation and fixing of heat shrinkable type 11 kv cable joiting kit 3x120/3x70 sq mm xlpe cable box as per norms., high pressure testing after completion of laying of 11 kv xlpe cable, fixing of joints & termination. (testing equipment shall be arranged by the contractor)., making cable jointing kit i/d & o/d 3x120/3x70 sq.mm., installation of meter qubical., installation of ct/pt combinud unit., route cable marker with size 3x1.5 feet stone for underground cable at every 100 mtr from initial point with notice "11 kv u/g line" painted on it (all the material, manpower and t&p will be arranged by the contractor at his own cost)., road restoration charges for pucca road crossing., road restoration charges for footpath side., laying stringing & sagging of lt xlpe cable abc 3x120+1x95+1x16/3x50+1x35+1x16/1x25+ 1x16 sq.mm., erection and mounting of 25 kva t/f., erection and mounting of 63 kva t/f., erection and mounting of 100 kva t/f., providing and installation of smc box for 25 kva to 100 kva., installation of 250/400 kva t/f on plinth., construction of plinth for 250/400 kva t/f including of all material as per respo norms., fencing work suitable of 250/400 kva t/f plinth of size 15x12x8 and angles of suitable size should be grouted
Tender For runningcontractfordepositworksunderedd-baldirai,sultanpur. - part-a (material), following materials supplied by the contractor :-, stone pad., lt clamp with nut & bolts., earth wire clamp with nut & bolts., clamp for top/t-off/dropper., suspension clamp., dead end clamp., eye hook., eye hook clamp., x-arm holding clamp., red oxide paint., alluminium paint., f-bracket., guarding angle., guarding angle clamp., shackle insulator., distribution box 3 phase with clamp., stay loop insulator, bolts, nuts & washers all sizes., l.t. connector (pearcing)., safe carriage/cartage of following items from store centre, sultanpur to work site including loading, unloading and proper stacking (distance within 0-50 km.), safe carriage of stp 11 mtr., safe carriage of pcc pole 8.5 mtr. long., safe carriage of acsr weasel conductor/dog conductor., safe carriage of 11 kv xlpe cable al. 3x120/3x70 sq.mm., safe carriage of lt xlpe cable abc 1 phase/3 phase., safe carriage of meter qubical., safe carriage of ct/pt combinud unit., safe carriage of t/f 25 kva., safe carriage of t/f 63 kva., safe carriage of t/f 100 kva., safe carriage of t/f 250 kva., safe carriage of t/f 400 kva., safe carriage of other line materials., dragging of stp from site to pit point., dragging of pcc pole from site to pit point., fabrication & errection of single pole 11 mtr support on stp including digging of pit & fixing of all accessories and clamps as per respo norms., fabrication & errection of double pole 11 mtr support on stp including digging of pit & fixing of all accessories and clamps as per respo norms., fabrication & errection of single pole support on pcc pole including digging of pit & fixing of all accessories and clamps as per respo norms., fabrication & errection of double pole support on pcc pole including digging of pit & fixing of all accessories and clamps as per respo norms., grouting of structure by digging od pit 1.83 mtr. deep for 11 mtr stp/8.5 mtr pcc pole foundation is provided with help of steel or wooden formers, groutung with 1:4:5 ratio cement, sand & first class brick ballast 0.285 cu mtr for 11 mtr stp/8.5 mtr pcc pole plinthing 0.3 mtr above g/l and proper plastering as per respo norms., earthing of 11 mtr stp/8.5 mtr pcc pole as per respo norms., stay complete., laying stringing & sagging of new acsr weasel conductor/dog conductor including binding jumpering etc., digging of trench & laying of cable 11 kv xlpe cable 3x120/3x70 sq.mm including sands & brick., hanging hosting & clamping and g.i. pipe channel nut & bolts 3x120/3x70 sq mm xlpe 11 kv cable (cost of all accessories will be borne by contractor) as per resspo norms., installation and fixing of heat shrinkable type 11 kv cable joiting kit 3x120/3x70 sq mm xlpe cable box as per norms., high pressure testing after completion of laying of 11 kv xlpe cable, fixing of joints & termination. (testing equipment shall be arranged by the contractor)., making cable jointing kit i/d & o/d 3x120/3x70 sq.mm., installation of meter qubical., installation of ct/pt combinud unit., route cable marker with size 3x1.5 feet stone for underground cable at every 100 mtr from initial point with notice "11 kv u/g line" painted on it (all the material, manpower and t&p will be arranged by the contractor at his own cost)., road restoration charges for pucca road crossing., road restoration charges for footpath side., laying stringing & sagging of lt xlpe cable abc 3x120+1x95+1x16/3x50+1x35+1x16/1x25+ 1x16 sq.mm., erection and mounting of 25 kva t/f., erection and mounting of 63 kva t/f., erection and mounting of 100 kva t/f., providing and installation of smc box for 25 kva to 100 kva., installation of 250/400 kva t/f on plinth., construction of plinth for 250/400 kva t/f including of all material as per respo norms., fencing work suitable of 250/400 kva t/f plinth of size 15x12x8 and angles of suitable size should be grouted
Tender For runningcontractfordepositworksunderedd-jaisinghpur,sultanpur. - part-a (material), following materials supplied by the contractor :-, stone pad., lt clamp with nut & bolts., earth wire clamp with nut & bolts., clamp for top/t-off/dropper., suspension clamp., dead end clamp., eye hook., eye hook clamp., x-arm holding clamp., red oxide paint., alluminium paint., f-bracket., guarding angle., guarding angle clamp., shackle insulator., distribution box 3 phase with clamp., stay loop insulator, bolts, nuts & washers all sizes., l.t. connector (pearcing)., safe carriage/cartage of following items from store centre, sultanpur to work site including loading, unloading and proper stacking (distance within 0-50 km.), safe carriage of stp 11 mtr., safe carriage of pcc pole 8.5 mtr. long., safe carriage of acsr weasel conductor/dog conductor., safe carriage of 11 kv xlpe cable al. 3x120/3x70 sq.mm., safe carriage of lt xlpe cable abc 1 phase/3 phase., safe carriage of meter qubical., safe carriage of ct/pt combinud unit., safe carriage of t/f 25 kva., safe carriage of t/f 63 kva., safe carriage of t/f 100 kva., safe carriage of t/f 250 kva., safe carriage of t/f 400 kva., safe carriage of other line materials., dragging of stp from site to pit point., dragging of pcc pole from site to pit point., fabrication & errection of single pole 11 mtr support on stp including digging of pit & fixing of all accessories and clamps as per respo norms., fabrication & errection of double pole 11 mtr support on stp including digging of pit & fixing of all accessories and clamps as per respo norms., fabrication & errection of single pole support on pcc pole including digging of pit & fixing of all accessories and clamps as per respo norms., fabrication & errection of double pole support on pcc pole including digging of pit & fixing of all accessories and clamps as per respo norms., grouting of structure by digging od pit 1.83 mtr. deep for 11 mtr stp/8.5 mtr pcc pole foundation is provided with help of steel or wooden formers, groutung with 1:4:5 ratio cement, sand & first class brick ballast 0.285 cu mtr for 11 mtr stp/8.5 mtr pcc pole plinthing 0.3 mtr above g/l and proper plastering as per respo norms., earthing of 11 mtr stp/8.5 mtr pcc pole as per respo norms., stay complete., laying stringing & sagging of new acsr weasel conductor/dog conductor including binding jumpering etc., digging of trench & laying of cable 11 kv xlpe cable 3x120/3x70 sq.mm including sands & brick., hanging hosting & clamping and g.i. pipe channel nut & bolts 3x120/3x70 sq mm xlpe 11 kv cable (cost of all accessories will be borne by contractor) as per resspo norms., installation and fixing of heat shrinkable type 11 kv cable joiting kit 3x120/3x70 sq mm xlpe cable box as per norms., high pressure testing after completion of laying of 11 kv xlpe cable, fixing of joints & termination. (testing equipment shall be arranged by the contractor)., making cable jointing kit i/d & o/d 3x120/3x70 sq.mm., installation of meter qubical., installation of ct/pt combinud unit., route cable marker with size 3x1.5 feet stone for underground cable at every 100 mtr from initial point with notice "11 kv u/g line" painted on it (all the material, manpower and t&p will be arranged by the contractor at his own cost)., road restoration charges for pucca road crossing., road restoration charges for footpath side., laying stringing & sagging of lt xlpe cable abc 3x120+1x95+1x16/3x50+1x35+1x16/1x25+ 1x16 sq.mm., erection and mounting of 25 kva t/f., erection and mounting of 63 kva t/f., erection and mounting of 100 kva t/f., providing and installation of smc box for 25 kva to 100 kva., installation of 250/400 kva t/f on plinth., construction of plinth for 250/400 kva t/f including of all material as per respo norms., fencing work suitable of 250/400 kva t/f plinth of size 15x12x8 and angles of suitable size should be grou
Tender For runningcontractfordepositworksunderedd,sultanpur. - part-a (material), following materials supplied by the contractor :-, stone pad., lt clamp with nut & bolts., earth wire clamp with nut & bolts., clamp for top/t-off/dropper., suspension clamp., dead end clamp., eye hook., eye hook clamp., x-arm holding clamp., red oxide paint., alluminium paint., f-bracket., guarding angle., guarding angle clamp., shackle insulator., distribution box 3 phase with clamp., stay loop insulator, bolts, nuts & washers all sizes., l.t. connector (pearcing)., safe carriage/cartage of following items from store centre, sultanpur to work site including loading, unloading and proper stacking (distance within 0-50 km.), safe carriage of stp 11 mtr., safe carriage of pcc pole 8.5 mtr. long., safe carriage of acsr weasel conductor/dog conductor., safe carriage of 11 kv xlpe cable al. 3x120/3x70 sq.mm., safe carriage of lt xlpe cable abc 1 phase/3 phase., safe carriage of meter qubical., safe carriage of ct/pt combinud unit., safe carriage of t/f 25 kva., safe carriage of t/f 63 kva., safe carriage of t/f 100 kva., safe carriage of t/f 250 kva., safe carriage of t/f 400 kva., safe carriage of other line materials., dragging of stp from site to pit point., dragging of pcc pole from site to pit point., fabrication & errection of single pole 11 mtr support on stp including digging of pit & fixing of all accessories and clamps as per respo norms., fabrication & errection of double pole 11 mtr support on stp including digging of pit & fixing of all accessories and clamps as per respo norms., fabrication & errection of single pole support on pcc pole including digging of pit & fixing of all accessories and clamps as per respo norms., fabrication & errection of double pole support on pcc pole including digging of pit & fixing of all accessories and clamps as per respo norms., grouting of structure by digging od pit 1.83 mtr. deep for 11 mtr stp/8.5 mtr pcc pole foundation is provided with help of steel or wooden formers, groutung with 1:4:5 ratio cement, sand & first class brick ballast 0.285 cu mtr for 11 mtr stp/8.5 mtr pcc pole plinthing 0.3 mtr above g/l and proper plastering as per respo norms., earthing of 11 mtr stp/8.5 mtr pcc pole as per respo norms., stay complete., laying stringing & sagging of new acsr weasel conductor/dog conductor including binding jumpering etc., digging of trench & laying of cable 11 kv xlpe cable 3x120/3x70 sq.mm including sands & brick., hanging hosting & clamping and g.i. pipe channel nut & bolts 3x120/3x70 sq mm xlpe 11 kv cable (cost of all accessories will be borne by contractor) as per resspo norms., installation and fixing of heat shrinkable type 11 kv cable joiting kit 3x120/3x70 sq mm xlpe cable box as per norms., high pressure testing after completion of laying of 11 kv xlpe cable, fixing of joints & termination. (testing equipment shall be arranged by the contractor)., making cable jointing kit i/d & o/d 3x120/3x70 sq.mm., installation of meter qubical., installation of ct/pt combinud unit., route cable marker with size 3x1.5 feet stone for underground cable at every 100 mtr from initial point with notice "11 kv u/g line" painted on it (all the material, manpower and t&p will be arranged by the contractor at his own cost)., road restoration charges for pucca road crossing., road restoration charges for footpath side., laying stringing & sagging of lt xlpe cable abc 3x120+1x95+1x16/3x50+1x35+1x16/1x25+ 1x16 sq.mm., erection and mounting of 25 kva t/f., erection and mounting of 63 kva t/f., erection and mounting of 100 kva t/f., providing and installation of smc box for 25 kva to 100 kva., installation of 250/400 kva t/f on plinth., construction of plinth for 250/400 kva t/f including of all material as per respo norms., fencing work suitable of 250/400 kva t/f plinth of size 15x12x8 and angles of suitable size should be grouted on all 0
Tender For deposite work under edsd- rania - carriage of following material from store center or from any other place to the respective site of work distence up to 75 km through the kachha pacca road including the work of its loading & unloading at the respective ends also including the work of its dragging etc. and also including the cost of labour, t & p and carrier etc. required for proper completion of work., 8.5 mtr pcc pole, 11 mtr stp, different line material ( conductor, x-arm,channel, insulator , g.i. wire , stay wire & rod, earth rod , db box etc.), different capacity dt( 100/63/25/16/10 kva ), pilfer unit , ct/pt double metering unit ., erection of following material :, x-arm holding clamp / holding clamp with n&b, f- clamp with n&b, i/d & o/d type cable jointing kit suitable for 11 kv xlpe cable ( different size), stay insulator, g.i. pipe 6" dia, stone pad, anti climbing device as per respo norms ( with barbed wire ), danger board as per respo norms., erection of following material including the work of complete h.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t & p and carrier etc. required for proper completion of work. (with proper earthing.), single pole structure of 8.5 mtr pcc pole, single pole structure of 11 mtr stp pole, double pole structure of 8.5 mtr pcc pole, double pole structure of 11 mtr stp pole, stay set, laying of 11 kv xlpe cable (different size ) as per respo manual and as per direction of je inchrge., laying of 11 kv xlpe cable (different size ) inside g.i. pipe ., laying, sagging, stringing, binding and jumpering etc. of weasal/racoon /dog conductor on the newly erected pole/ old pole as per respo manual and as per direction of supervising engineer. it includes the cost of labour, t & p, carries etc. required for proper completion of work., grouting of pole as per respo norms ( cement, sand , blast stone with the ration 1:4:8 will be provided by contractor ), grouting of stay set( cement, sand , blast stone with the ration 1:4:8 will be provided by contractor ), muffing of s.t.p. as per respo norms ( require material will be provided by contractor ), dismantling of existing 33kv/11 kv / l.t. line and removal of all accessories & fittings from poles, re-rolling of conductor and proper stacking and cartage of dismantled conductor & accessories from site of work to dvvnl, store., making joint with the help of cable jointing kiit (11 kv ), mounting of d.t. (100/63/25/16/10 kva ) upon double pole as per respo manual., installation of ct/pt unit as per respo manual., installation & grouting of pilfer unit as per respo manual., cutting of tree branches for clearness of line.
Tender For corrigendum : various routine/preventive and breakdown maintenance work on as and when require basis at chp-gtps - replacement of hammer rings for stage ii crusher , replacement of hammer rings for stage i crusher , replacement of screen plate / breaker plate/kick off plate of stage i and ii crushers , replacement of rotor of stage i crusher with disassembling of removed rotor and assembling of new/repaired rotor , replacement of drive end side bearing / pedestal of crusher rotor or complete gear coupling set of crusher or repositioning of dislocated rotor of crusher , replacement of non drive end side bearing/pedestal of crusher rotor or complete alignment of crusher motor with crusher rotor , replacement of broken hammer rings of stage i and ii crushers (stage i crusher up to 12 nos.of hammer rings and stage ii crusher up to 06 nos. of hammer rings at a time) , replacement of rail of rail table of wagon tipplers 1/2/3/4 (in one side full length) , replacement of clamping rubber pads of clamp for wagon of wagon tipplers , replacement of whole resting pads for wagon of side beam of wagon tipplers , replacement of spill plate roller of wagon tipplers , repairing/preparation/ fitting and replacement of hooks/rods/turn buckle, chain, sling rope ,spring assembly etc. of vibrating trays and crusher house trays , spillage control at various locations , miscellaneous cutting/welding work require at various locations , replacement of gearbox in conveyor no. 2a/b,11a/b,12a/b,13,14/15,16a/b,17a/b ,18a/b,drc/apron/rg/,wagon tipplers,stacker-reclaimer , replacement of gearbox in conveyor no.,5a/b,8a/b,10a/b,shuttle conveyor 1/2,belt feeder 1/2 ,roller screen, mrc 3/4/5,wobbler feeder ,dribble conveyor 1/2 , replacement of slow speed coupling set (two halves) of drive pulley , replacement of coupling bolts and rubber bushes of slow/high speed coupling(input/output coupling ) in conveyor no.2a/b,11a/b,12a/b,13,14/15,16a/b,17 a/b,18a/b,drc/apron/rg/,wagon tipplers,stacker-reclaimer , replacement of coupling bolts and rubber bushes of slow/high speed coupling(input/output coupling ) in conveyor no.,5a/b,8a/b,10a/b,shuttle conveyor 1/2,belt feeder 1/2 ,roller screen, mrc 3/4/5,wobbler feeder ,dribble conveyor 1/2 , replacement/removing/refitting of various size and type of fluid coupling , replacement or removing & refitting of any internal/bearing/input/ output oil seal of various size and type of gear box , overhauling of dismantles old/used gearbox in all respect with fitment of input and output coupling. , replacement of drive pulley , replacement of drive end side bearing of drive pulley or repositioning of dislocated drive pulley , replacement of non drive end side bearing/any side pedestal of conveyor drive/non drive pulley , alignment of motor/ gearbox/drive pulley including decouple/couple of coupling , nut bolt and drive system checking with replacement of broken nut bolt in all 04 wagon tipplers no.1/2/3/4 as per scope , lifting and releasing of gravity take up of any conveyor belt for locking and de locking of belts for other than belt replacement work , loosening and tightening of horizontal type screw take assembly of any conveyor belts for other than belt replacement work , work of dismantling and re erection of new/repaired apron pan from existing apron feeder of wagon tippler , repairing of upper/lower structure/cone plates of damaged/bend apron pan , replacement of carrying roller of apron feeder , replacement of worn out/ damaged ti roller and garland rollers. , replacement of worn out/ damaged impact rollers , replacement of worn out/ damaged return rollers , replacement of various worn out/ damaged ti roller stands , replacement of various worn out/ damaged impact roller stands , replacements of various worn out/ damaged return roller stands , replacement of various worn out skirt rubbers [10 m each] and skirt rubber with angle , preparation and replacement of guide rollers with bracket in place of worn out/ damaged gu